Putting the U in Guardening at the front gate.
Putting the "U" in Guardening. The Astor Gate entrance has become one of the new gems on campus.

Frampton Hall got a long needed exterior facelift. Several interior upgrades are planned.

Frampton Hall got a long needed exterior facelift.

The sidewalk will be ready for the first day of school.

Several interior upgrades are planned for Frampton Hall.

Frampton sidewalk project.

The new sidewalk will be ready for the first day of school.

The basketball lot is getting asphalt. The Van Cleve students will have a safer play area here.

The basketball lot is getting asphalt.

Asphalt project in the basketball court area of Van Cleve.

The Van Cleve students will have a safer play area here.

The paths outside Wood-Russ to the gym were replaced.

The paths outside Wood-Russ to the gym were replaced.

Still a work in progress, this area in the second floor above the Business Office will open in 2009 as the NYISE Historical Museum.

Still a work in progress, this area in the second floor above the Business Office will open in 2009 as the NYISE Historical Museum.

 

TOP OF PAGE


 

 
 
     
For our Annual Report and information on making a tax-deductible contribution contact:

The New York Institute for Special Education
Kim Benisatto, Operations Manager

999 Pelham Parkway Bronx, New York 10469 USA
Phone: (718) 519-7000 Ext. 315 Fax: (718) 231-9314